Pris og tilbud på drejede dele
Omkostningerne ved bearbejdning af materialer er sikre. Den største forskel ligger i hver virksomheds forskellige lønomkostninger, transportudgifter, forbrugsomkostninger, og skatter. Så disse dele CNC-bearbejdningsanlæg på hvilken måde det beregnes det meste af?
Det følgende er en kompilering af en del af CNC-drejedataene til reference (fordi beregningsmetoden varierer afhængigt af prisen på det enkelte sted).
The detailed calculation method of CNC turning:
1) Først og fremmest, you can ask the supplier to provide preliminary CNC turning process arrangements for key or complex parts, detailing each process and the time consumption of each process.
2) The processing cost can be calculated according to the hourly cost of the equipment required for each process. You can also ask the supplier for the specific equipment cost, for eksempel: Ordinary end milling CNC machining is at ¥60~80/hour (tax included); Common equipment such as milling machine and general turning is generally ¥30/hour.
3). Add packaging and transportation, management costs, tooling, drejeværktøj, and profit in proportion to the price. Selvfølgelig, to a certain extent, prisen vil have meget at gøre med den årlige indkøbsmængde og sværhedsgrad og lethed af delene. Prisforskellen mellem en enkelt prototype og en stor batch er meget let at forstå.
Groft vurderingsmetode for CNC-drejedele:
1) Til store emner, volumen er større og vægten er tungere.
Generel vanskelighed: Forholdet mellem forarbejdningsomkostningerne og prisen på råmaterialerne for hele delen er ca 1:1. Dette forhold er omvendt proportionalt med indkøbsvolumen;
Komplekse drejende emner: Forholdet mellem forarbejdningsomkostningerne og råvareomkostningerne for hele delen er omkring 1,2 ~ 1,5:1. Dette forhold er omvendt proportionalt med indkøbsvolumen;
2) Til små og mellemstore drejende emner
Generel vanskelighed: Forholdet mellem CNC-bearbejdningsomkostninger og prisen på hele delens råmaterialer er omkring 2 ~ 3:1. Dette forhold er omvendt proportionalt med indkøbsvolumen;
Vanskelige og komplekse dele: Forholdet mellem forarbejdningsomkostningerne og råvareomkostningerne for hele delen er ca 5-10:1. Dette forhold er omvendt proportionalt med indkøbsvolumen;
Fordi bearbejdning har stor procesfleksibilitet, det er, en del kan have mange slags procesordninger, prisen er selvfølgelig anderledes. Imidlertid, nogle gange vil leverandøren fortælle dig en kompliceret proces for at hæve prisen, når du citerer, mens andre simple processer vil blive brugt i den egentlige produktion. Derfor, Køberens egen forståelse af tegningerne og CNC-bearbejdningskendskab til dele bestemmer din omkostningskontrol. Derfor, køb af mekaniske dele kræver omfattende viden om CNC-bearbejdning.
1. Grundpris for drejning: 20-40 ¥/timen
De nærmere omstændigheder afhænger af den faktiske situation. Som småting, den simple arbejdstid er mindre end 20 ¥/timen; nogle gange endda kun ¥10/time.
For eksempel, for some large pulleys, CNC machining has a large margin, and manufacturers can make a profit as long as they earn money from waste powder;
Sometimes if the workpiece is large, the general factory cannot process it, so you can quote a higher price two or three times higher, and the customer has no choice.
Cost and Quotation of Copper Turned Parts
Attached to the basic price of processing hours for each type of work
Serial number, equipment name, model, processing range, forarbejdningsomkostninger (yuan/time)
1. Lathe, C616, Φ320×750~1000, ¥11/hour
2. Lathe, C6140, Φ400×1000~2000, ¥13/hour
3. Lathe J1-MAZAK, Φ460×1000~2000, ¥15/timen
4. Lathe C6150, Φ460×1000~2000, ¥15/timen
5. Lathe C630, Φ630×1000~2000, ¥21/hour
6. Lathe C650, Φ800×1500~5000, 30 ¥/timen
7. Vertikaldreh maschine C5116A, Φ1600, ¥ 28 / Stunde
8. Radialboh rmaschine Z3050, ~ 50 ~ ~ 63, ~ 16 / Stunde
9. Radialbohr maschine Z3080, Φ80, ¥ 20 / Stunde
10. Vertikale Bohr maschine Z5140A, Φ32 ~ Φ40, ¥ 12 / Stunde
11. Horizontalboh rmaschine T68, 1000 × 1000, ¥ 26 / Stunde
12. Horizontalboh rmaschine T611, 1000 × 1000, ¥ 30 / Stunde
13. Vertikale Bohr maschine T4163, 630 × 1100, ¥ 56 / Stunde
14. Horizontalbohr maschine T6111A, 1200 × 1200, ¥ 36 / Stunde
15. Universal-Rundschleif maschine M1420, Φ125 ~ 220 × 350 ~ 1000 ¥ 15 / Stunde
16. Universal-Rundschleif maschine M1432A, M9025 × 500 ~ 1000 ¥ 19 / Stunde
17. Universal-Rundschleif maschine M1432B, Φ315 ~ 320 × 1500 ~ 3000, ¥ 26 / Stunde
18. Universal cylindrical grinder M1331A, Φ315~320×1500~3000, ¥26/hour
19. Universal cylindrical grinder M1450, Φ500×1500~2000, ¥28/hour
20. Precision universal cylindrical grinder MG1432, Φ320×1000~2000, ¥32/hour
21. Internal grinder MG1432, Φ12~Φ100×130, ¥13/hour
22. Surface grinder M7120, 200×630~650, ¥16/hour
23. Surface grinder M7130, 300×1000, ¥21/hour
24. Surface grinder M7150, 500×2000, ¥40/hour
25. Guide rail grinder M50100, 1000×6000, ¥28/hour
26. Spline grinder M8612A, Φ120×1800, ¥28/hour
27. Thread grinder Y7520W, Φ200×500, ¥20/hour
28. Gear grinder Y4632A, Φ320×6M, 30 ¥/timen
29. Universal tool grinder M5MC, Φ200×500, ¥13/hour
30. Universal tool grinder MW6020, Φ200×500, ¥13/hour
31. Universal tool grinder M9025, Φ200×650, ¥16/hour
32. Universal tool grinder M6025H, Φ250×650, ¥16/hour
33. Universal tool grinder M6425, Φ250×650, ¥16/hour
34. Broach grinder M6110D, Φ100×1500~1700, ¥16/hour
35. Gear hobbing machine YM3150E, Φ500×8M, ¥22 /hour
36. Rod rack YM5150B, Φ500×8M, ¥18/hour